The company executed fabrication, installation, and mechanical welding for various systems and piping networks inside the power plant to support electricity generation operations under the highest quality and safety standards.
The company supplied specialized technical personnel including mechanics, welders, and technicians to support industrial operations within the Jordan Bromine facilities. The technical teams also participated in implementing modifications and periodic maintenance for chemical storage tanks according to operational and safety requirements. These works enhanced equipment reliability and sustained production within a highly sensitive industrial environment.
The company undertook the installation and welding of main gas lines for the factory according to approved engineering designs, alongside installing fire fighting systems, and moving and erecting production equipment. The works also included main electrical panel setups and internal lighting for the factory and warehouses. The project was handed over as an integrated system supporting production and operation with high efficiency.
The company executed the construction and equipping of the factory's main hangars, including fabricating and installing stainless steel food-grade storage tanks and extending pipelines connected to the production line. The scope also covered water and gas networks, fire fighting systems, and installing sandwich panels for cold rooms and storage facilities. The project was executed to the highest industrial standards to ensure operational efficiency and sustainability.
A 48-inch pipeline was installed in the Deir Alla area in accordance with the specified schedule and with high quality that meets the required standards. The scope covered all phases from design to construction and commissioning, and was delivered according to the agreed specifications, including the installation of the necessary pumps for the pumping station, which were selected based on project requirements to ensure operational efficiency and continuous performance.
The company executed the mechanical and structural installation of the Red Potash building, including installing metal cover systems to the highest quality and safety standards. The scope also included fabricating and welding main staircases and installing handrails for the entire building to ensure operational readiness and engineering safety. The project was executed with high efficiency, complying with technical specifications and the approved schedule.
The project included the removal and replacement of the main Scrapper system in the station, in addition to executing the gas line bypass works. The works also included sandblasting, painting, installing main filters, and laying and welding the associated pipelines. The project was completed to the highest safety and quality standards to ensure continuous and efficient station operations.
The company fabricated and installed main storage tanks for raw materials, in addition to installing production line units and equipment. The scope also included implementing electrical systems, industrial lighting, and connecting and testing machinery according to factory operational requirements. The project contributed to creating an integrated production setup supporting industrial efficiency.